An EV charger may operate correctly with a test load yet fail to start charging a vehicle—or stop unexpectedly during a session. For manufacturers, system integrators, and service teams, this creates a difficult question: is the problem in the power circuit, the communication controller, or their interaction?

ISO 15118-20:2022 addresses second-generation network and application layer requirements for communication between electric vehicles and charging equipment. It also defines communication messages and sequence requirements for bidirectional power transfer. This makes it a useful reference when investigating vehicle–charger coordination. www.iso.org

The following workflow provides engineering guidance for a DC charging test setup. It is not a substitute for the complete standard or an applicable conformance test specification.

1. Why Does This Problem Occur?

A successful load test demonstrates selected power capabilities under the conditions tested. It does not establish that a charger can communicate correctly with every intended vehicle.

Potential causes include incompatible protocol implementations, unsuccessful service negotiation, authentication configuration problems, or unexpected message timing. Charging may also fail when requested operating limits do not match the capabilities advertised by either side.

Start by identifying the stage at which the session fails. Compare communication events with electrical measurements before replacing a power module or modifying controller software.

2. What Is the Testing Principle?

Use an electric vehicle communication controller (EVCC) simulator that supports the required protocol and services to interact with the charger’s supply equipment communication controller (SECC). www.iso.org

The simulator creates repeatable vehicle-side scenarios while measurement equipment records the electrical response. Engineers can then compare requests, responses, session states, and measured voltage and current on a common timeline.

This approach helps distinguish a communication failure from a power response problem. Protocol conformance, interoperability with different implementations, and electrical performance should each have clearly defined acceptance criteria.

3. What Equipment and Connections Are Needed?

A practical setup includes a compatible EVCC protocol simulator, a charging interface adapter, a programmable DC load or bidirectional battery simulator, and voltage and current measurement equipment. An oscilloscope captures transient behavior, while a power analyzer supports electrical performance assessment.

For bidirectional testing, the power equipment must both absorb and deliver energy within the required operating range.

4. How Should Test Parameters Be Set?

First, select the intended protocol version, connector configuration, and charging or discharging service. Confirm that the charger and simulator support the selected combination.

Next, configure simulated battery voltage, state of charge, and current and power limits. Keep settings within the ratings of the charger, cables, interface adapter, and power equipment.

Then configure authentication, required certificates, and communication logging. Establish synchronized timestamps for electrical measurements and protocol records.

Begin with a low-power normal session. Progress to operating-point changes, repeated sessions, and controlled abnormal scenarios. Use timing thresholds and acceptance limits from the applicable specifications rather than arbitrary values.

5. What Results and Waveforms Should Be Reviewed?

A useful report combines message sequences, response timing, reported limits, session outcomes, and voltage and current traces.

For an interrupted session, check whether a communication error occurred before current decreased, or whether an electrical disturbance appeared first. This sequence helps narrow the investigation, although additional checks may be needed to establish the cause.

For bidirectional operation, also examine power direction and behavior during transitions between operating modes. Record the sign convention used by the instruments.

These are interpretation examples, not measured IUXPOWER results. Any published waveform should identify its test conditions and whether it represents actual measurements or an illustration.

6. What Are the Common Testing Mistakes?

Common mistakes include treating a full-load test as proof of communication compatibility, assuming that connector appearance determines protocol support, and confusing GB/T CAN testing with ISO 15118 testing.

Other issues include incorrect authentication settings, expired certificates, unsynchronized timestamps, and incomplete fault logs.

An energy-regenerating load should also not automatically be treated as a bidirectional battery simulator. Confirm whether the selected device can supply power as well as absorb it, and whether its operating envelope matches the test.

7. What Solution Is Recommended?

Use a staged process: verify communication behavior, evaluate electrical performance, and then run coordinated tests under representative operating conditions.

Build repeatable cases for successful charging, limit changes, interrupted sessions, and recovery. After changing firmware or configuration, repeat the relevant cases to check that the original fault is resolved.

Before selecting equipment, confirm ISO 15118-20 protocol support, implemented services, software version, authentication capabilities, and available test cases. These details determine coverage; a product name or charging connector alone does not.

8. Which IUXPOWER Products Are Relevant?

Explore the IUXPOWER EVD DC EV Charger ATE Test System for charging test system requirements and the IPDC2000 Multifunctional Bidirectional DC Power Supply for power sourcing and absorption requirements. www.iuxpower.com

These products can be discussed as components of a proposed test setup. ISO 15118-20 communication support and complete system coverage must be confirmed for the specific configuration.

9. How Can You Request a Datasheet or Submit Test Requirements?

Contact sales@iuxpower.com to request a configuration-specific datasheet or submit your testing needs.

Include the connector type, protocol version, voltage, current, power range, required services, and whether bidirectional operation is needed. For troubleshooting, also provide firmware versions, failure descriptions, and available communication logs.

IUXPOWER can review these requirements with your team and discuss an appropriate equipment configuration for development, production testing, or field investigation.